Tag: Operating Systems

From Windows and macOS to Linux, I have all three operating systems installed and running almost daily. Each one for specific purposes.

Arch Linux Review: Is it even worth using in 2026?

After many years of hesitation, I finally gave Arch Linux another try and finally installed, configured, and adjusted everything using…

14 Min Read

Windows vs. Linux: Is there even a point comparing them?

There's a big debate when it comes to Windows and Linux and which one is better. I use them both,…

13 Min Read

How to install Manjaro Linux alongside Windows (2025)

Looking to try Manjaro Linux or install it alongside Windows? Here's how to download the latest version, create a bootable…

8 Min Read

I talked my friend into trying Linux: It didn’t go as planned

A friend of mine saw his Windows laptop getting hacked and asked for help. I talked to him about switching…

12 Min Read

EndeavourOS is the Linux Distro I have always wanted

Have you ever used EndeavourOS? The Arch-based Linux distro is the best alternative for everyone looking for something slick, easy…

7 Min Read